Epson Stylus C58/C59/ME 2/C79/D78/C90/C91/C92/D92/T20/T20E/T23/T26/S20/T10/T11/ME 30/T21/T24/T27/S21   Revision E
DISASSEMBLY/ASSEMBLY      Disassembly Procedures 37
Confidential
4.2  Disassembly Procedures
This section explains the procedures for disassembling the product.  
Unless otherwise stated, reassembly should be carried out in the reverse order of the 
disassembly procedure. 
 
For detailed engagement relations among main components, refer to the exploded 
diagrams in the Appendix.
Figure 4-2.  Disassembling Flowchart
Procedures partially different from model to model are described 
in 
“Check Point” and “Reassembly”.
 Note: Shown in the dotted-line is not the 
shortest procedure, but is necessary to 
proceed to the next step.
“4.3.1 Upper 
Housing” (p38)
“4.5.1 Hopper” 
(p42)
“4.4.1 Main 
Board” (p40)
*
“4.5.10 LD Roller/
ASF Unit” (p59)
“4.5.2 Printhead” 
(p43)
“4.5.3 CR Scale” 
(p46)
“4.5.4 CR Motor” 
(p47)
“4.5.9 Main 
Frame” (p56)
Ink System (Cap 
Assy) (p51)
“4.5.7 Power 
Supply Board” 
(p53)
“4.5.8 EJ Frame 
Assy/EJ Roller” 
(p54)
START
*“4.5.12 PF 
Roller” (p62)
*“4.5.13 PF 
Motor” (p63)
*“4.5.11 Waste 
Ink Pads” (p61)
*Ink System 
(Pump Assy) (p51)
“4.5.6 Ink System removal” (p51)
“4.5.5 CR Unit/
Timing Belt” 
(p48)
* The Shortest Way to Remove the Main Frame
If the parts to repair is the ones marked with “*” in the flowchart 
only, there’s another way to remove the parts until the Main 
Frame shown in the flowchart. Refer to “4.7 The Shortest Way to 
Remove the Main Frame. (p. 68) ”