7
installation guide
STEP 7
STEP 8
STEP 9
STEP 10
Carefully flip the base over on to its legs. Important: Two people are
required to move the bed base. Do not drag across the floor. Do not rest
frame on its side, excessive pressure may damage the legs.
Plug the Power Cord into a power source. A surge protector is strongly
recommended.
Ensure that batteries are correctly installed in the remote. Test remote
functions to verify proper setup before placing mattress on base. Return
the base to a FLAT position before placing the mattress on top.
Setup is now complete!
Test all functions on remote.
To install the mattress retainer bar, insert each end of the bar into the
holes at the foot of the platform.
STEP 5
STEP 6
Uncoil Input Cord (connected to Control Box’s
power port) and plug into Power Supply.
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure that
the Power Supply and all attached cords are
directed toward the desired surge protector.
For customer support, visit www.ergomotion.com or call: 1-888-550-3746