Installing RBS
7 Route Cables
Route all cables through the cable holders on the left hand side of the RBS.
Group the cables with cable ties where needed.
8 Verify
9 Clean Up
Confirm that the green operational
indicator is on and that no alarms are
active. In case of error, refer to the
document Handling Faults On-Site.
Remove the drilling
template.
Dispose of waste according
to local regulations.