EasyManua.ls Logo

Ericsson RBS 6401 - Page 8

Ericsson RBS 6401
14 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing RBS
7 Route Cables
Route all cables through the cable holders on the left hand side of the RBS.
Group the cables with cable ties where needed.
8 Verify
9 Clean Up
Confirm that the green operational
indicator is on and that no alarms are
active. In case of error, refer to the
document Handling Faults On-Site.
Remove the drilling
template.
Dispose of waste according
to local regulations.
8
25/1531-LZA 701 6001 Uen H | 2013-11-14

Related product manuals