EasyManua.ls Logo

ESP Ecocent 250T - Page 7

ESP Ecocent 250T
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 of 34
V 1.0
www.esavep.com
2.4 Notes on moving and repairing your Ecocent:
2.5 Some Safety Notes:
2.6 General Requirements
IMPORTANT: PLEASE READ AND ENSURE THAT YOU UNDERSTAND THESE INSTRUCTIONS BEFORE
INSTALLING THE ESP ECOCENT (“DHW ASHP” OR “UNIT”). INCORRECT INSTALLATION WILL
INVALIDATE ANY GUARANTEE AND MAY BE DANGEROUS.
Siting the
Unit
The unit must only be installed indoors the unit is neither
designed for, nor suitable for, installation outside. The Unit
needs to be sited where the ambient temperature never
goes below 5 degrees. If the unit is to be left unused for any
significant period of time during which the ambient
temperature could cause the unit or pipe work from the unit
to freeze, it should be drained down.
Shut off the
power
When cleaning the unit, shut off the power supply.
Power
Supply
You must use a suitable power supply that is appropriately
Fused and protected by an RCD.
Caution
This unit has a high centre of gravity. This Ecocent must be
secured to prevent it falling over when in transit.
Suitably
qualified
engineer
When moving the unit or carrying out repair work please be
sure to use only a suitably qualified engineer.
Do NOT
Do NOT try to install, move or repair the unit yourself it is
NOT worthwhile running the risk of injury.
Transporting
the Unit
The unit must be transported in the vertical position. It can
be tilted up to a maximum 3 from the vertical axis.

Related product manuals