ETC Installation Guide
F-Drive B-Box4
F-Drive B-Box4 Page 11 of 11 ETC
FD-BBOX-4M
1. Plug the Molex connector from an ArcSystem Pro One-Cell standard, Small, or Micro
luminaire cable into the "CH 1", "CH 2", "CH 3", or "CH 4" output of the FD-BBOX-4M.
2. Repeat step 1 to connect one ArcSystem Pro One-Cell luminaire per Molex output.
3. Configure each output of the F-Drive R12 output card or W1Driver to provide the correct
current for your luminaires. See
Configure the Output Current on page 11
.
FD-BBOX-4T
1. Prepare the wires for the provided screw-terminal plugs (ETC part J3388-F).
• See
Electrical and Wiring Specification on page8
for the wire gauges accepted by the
screw-terminal connectors and strip the wires according to the strip length listed.
2. Connect the loads to outputs "CH 1", "CH 2", "CH 3", and "CH4"using the two-terminal
plugs.
a. See the image above for polarity of the output terminals.
b. Wire the positive and negative wires from the load to separate terminals on the plug,
securing the terminal screws onto the wires.
c. Tug gently on the wires to ensure they are secure.
d. Insert the screw-terminal plug into the "CH1", "CH2", "CH3", or "CH4" receptacle.
3. Configure each output of the F-Drive R12 output card or W1Driver to provide the correct
currents for your luminaires or loads. See
Configure the Output Current below
.
Configure the Output Current
CAUTION: Setting the driver card to output more current than the
manufacturer's recommended fixture driver current may reduce the lifetime of
the fixtures or cause damage to the fixtures.
Each channel of the CC-150Card or W1CCDriver has adjustable output current and is factory-set
to output 200mA. You must configure each channel of the driver to provide the correct current
for the connected luminaire. For more information about configuring the output current, see the
F-Drive Series R12 Installation Manual
or
F-Drive Series W1 Installation Manual
at
etcconnect.com/Products/Power-Controls/LED-Drivers/F-Drive/Documentation.aspx.
Individual Channel Control
The load connected to each B-Box4 output responds to an individual output channel 1, 2, 3, or 4
from the F-Drive R12 output card or W1Driver. See the F-Drive Device Package Help in
ETCConcert for details on configuration with ETCConcert. See the
F-Drive Series R12 Installation
Manual
or the
F-Drive Series W1 Installation Manual
for details on RDMconfiguration of the
output channels.
Compliance
For current and complete compliance information, view the product datasheets at
etcconnect.com/Products/Power-Controls/LED-Drivers/F-Drive/Documentation.aspx. For complete
product documentation, including compliance documentation, visit etcconnect.com/products.