EasyManua.ls Logo

Everflo EF1000 - Page 10

Everflo EF1000
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
10
assembly
working condition:
2. Test with
water
Test the system for leaks with water:
a) Fill the tank with water.
b) The pump is an “on demand” pump. When turned on, the pump will
prime itself, then turn off once reaching pressure. When the flow
continues, the pump will automatically re-start.
c) Check for leaks throughout the system. If a leak is detected, fix the leak
and re-test the system with water.

Related product manuals