EasyManua.ls Logo

Expobar ZENITH Manual - Installation and Start-Up Procedures; Positioning and Environmental Requirements; Electrical Connection Guidelines; Initial Grinder Start-Up Process

Expobar ZENITH Manual
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R
10
ZENITH
The minimum dimensions for the place of the machine must be 360 mm wide x
415 mm depth x 620 mm high.
Positionthemachineonaatandstablesurface,awayfromwaterandsourcesof
heat.
It should be located in a dry environment, since excessive humidity will affect the
machine negatively.
Donotcoverthemachinewithplasticlmorcloths.
Only connect the machine to a grounded power supply.
Check the correct voltage and frequency on the technical data plate.
Positioning
Electrical connection
Starting the grinder
MIN. 10 cm
Note:
Make sure that air is able to circulate behind the machine (minimum 10 cm).
i
Insert the container into its seat; positioning it so
that the hole lines up with the screw on the back
part of grinder.
Tighten the lock screw.
01
02
INSTALLATION
AND START-UP