EasyManua.ls Logo

Extra 200 - Page 100

Extra 200
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 10
PAGE 5
EXT
RA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 200
PAGE DATE: 1. July 1996
10-20-00 MOORING
This section provides the procedures recommended for a
normal tie-down of the aircraft.
Proper tie-down procedure is the best precaution against
damage to the aircraft by gusty or strong winds. To tie-down
the aircraft securely, proceed as follows:
1. Head the aircraft into the wind
2. Place chocks fore and aft of each main wheel.
C A U T I O N When chocking the wheels, ensure that the chocks used
are not too large to come in contact with the wheel
fairings. The use of chocks that are too large may dam-
age the fairings.
3. Drive stakes into the ground approximately three feet
outboard of each wing tip and to either side of tail wheel.
4. Install one tie-down ring in each wing tip rib.
5. Tie a sufficiently strong rope to each wing tie-down
ring and anchor to the ground stakes. Allow a little slack
in each tiedown rope.
6. Tie the center of the rope to the tail wheel fork and an-
chor the rope ends to the ground stakes at either side of
the tail wheel.
7. Ensure that the canopy is closed waterproof and locked.

Other manuals for Extra 200

Related product manuals