5 Required End of Run Data
After completion of the job the Directional Driller at the wellsite is required to send in his final deliverables
to their Directional Drilling Coordinator. The Directional Drilling Coordinator is then responsible for
sending the final deliverables to the XER Operations Coordinator. At a minimum this must include the
following information:
• Final BHA
• Final Motor Report
• Master Copy Run Tracker, filled out with each run information
For any run that had a Service Quality issue and requires a Maintenance Finding Report (MFR), the
following information is also required:
• Downlink tracking sheet
• A typed out, detailed description of the issues experienced
• Any documents that may support the suspected failure mode (Mud Report for suspected LGS
out of specification for example)