2 Tool Preparation
2.1 Reviewing Tool Paperwork
The Rotary Steerable Outgoing Systems Test (OST) paperwork is a valuable document for the Directional
Driller. This paperwork will be provided by the Extreme Equipment Rental coordinator by the time tools
arrive on location. If not, contact the coordinator with the tool serial number so that the correct paperwork
can be provided. The tool serial number is stamped in the junk slot area of the bias unit, between two of
the PowerDrive pads as shown below.
2.1.1 Tool Configuration
The OST paperwork is full of information, not all of which is useful to the DD. Below is a list of the few
critical things to verify from each section. A PowerDrive should NEVER be picked up without first
verifying the tool is configured to meet the requirements of the job
Tool in Control Collar Load Out Sheet
1. Hole Size – This must match the hole size.
2. Bias Unit Serial Number and Type – Verify the BU type and serial number match what you have.
3. Orbit Ball/Sleeve Gaps – Enter these values into PD
2
as previously described in section 1.2.2.
Field Information Sheet
4. Battery Expiration – This is only relevant in the
rare event that the client needs recorded mode
gamma logs. PowerDrive does not use the
battery for normal operation.
5. RealTime Transmission – If running a MWD
capable of transmitting PD data, confirm this does
not say “Non RealTime” or “NRT”.
6. Gamma – Verify the tool contains a gamma
sensor if logging is planned.