MACHINE COMMISSIONING AND FUNCTION TESTS
INSTALLING THE MACHINE
Position the machine on a well leveled, smooth and dry top suitably dimensioned
to withstand the machine weight.
ELECTRICAL CONNECTION
Install the machine near a EU compliant outlet derived from a system meeting the
current norms.
The user is responsible for ascertaining that the electrical system is suitably
dimensioned and functions correctly (supply line, outlet, distribution panel,
differential protecting breaker, grounding).
Before carrying out the connection ascertain that the mains characteristics
correspondent to those indicated on the machine plate.