WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal. 
The pressure gauge is working properly. 
The self-leveling device is working properly.
The expansion valves are working properly
6. Installation Check-up
WARNING$)7(5,167$//$7,21&+(&.726((,)7+(0$&+,1(,6:25.,1*3523(5/<VHHWKH
Installation Module C)
GROUPS
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 4 liters of water have been used for a machine 
with 1 group, 6 liters of water have been used for a machine with 2 groups, and 9 liters for a machine with 3 groups (see the
“Cleaning and Maintenance” Chapter in the User’s Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE