1 2
1 2
English
27 EN
BODYWORK - This operation must be carried out at the end of each working day
Use a soft cloth and cleaning products WITHOUT ammonia
RUDEUDVLYHVUHPRYLQJDQ\RUJDQLFUHVLGXHSUHVHQWLQWKH
work area.
Note: Do not spray liquids into the panel slots.
DRAINING TRAY
- This operation must be carried out every 7 days
1. $IWHUUHPRYLQJWKHEDVLQUHPRYHWKHOLGRIWKHGUDLQLQJ
tray.
2. Remove any residue with a sponge and rinse well with
cold water.
- This operation must be carried out at the end of each
working day
3RXUDERXWDOLWUHRIKRWZDWHULQWRWKHGUDLQLQJWUD\WR
remove any discharge residues.
127(WKHSURFHGXUHVGHVFULEHGEHORZFDQDOVREHFDUULHGRXWZKHQWKHPDFKLQHLVVZLWFKHGRႇ
GRILLE AND DRIP BASIN - This operation must be carried out at the end of each working day
1. 5HPRYHWKHJULOOHIURPWKHEDVLQ
2. ([WUDFWWKHEDVLQ
3. Rinse the grille and tray under running water.
Danger of burns
DO NOTLQVHUW\RXUKDQGVEHQHDWK
the front panel.
HOT-WATER NOZZLE - This operation must be carried out at the end of each working day
Using a clean sponge, wash with hot water removing any
organic residue present. Rinse carefully.
'2127XVHDEUDVLYHSURGXFWV