EasyManua.ls Logo

FEIG MWD BP - Installation; Place of Installation; Installation Planning Hints

FEIG MWD BP
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instruction Manual Radar Motion Detector MWD BP 5/13
Manual MWD BP.doc as 07/21/2006 FEIG ELECTRONIC GmbH
2 Installation
2.1 Place of installation
The device is centrally mounted above the area to be monitored. Both wall- and ceiling mounting are possible. The
maximum mounting height is 7m.
2.2 Hints for planning and installation:
The device has to be mounted vibrationless.
In order to avoid incorrect release, there must not be any objects in motion within the radiation field.
There must not be any fluorescent tubes within the radiation field of the detector.
It should be avoided that the radiation fields of two motion detectors overlap, since this may lead to incorrect
releases.
Do not install behind objects, building coverings or elements.
If the motion detector is exposed to rain or snow, it should be adjusted to directional recognition.
If conductive floors are used and the radiation direction is almost vertical, incorrect releases may be caused
by reflections.