Do you have a question about the Festo CPV14 and is the answer not in the manual?
Explains the CPV valve terminal's compact structure and its benefits for automation tasks and cost reduction.
Details different electrical connection types: IC, CP direct, MP, and AS-Interface connections.
Details the sizes of CPV valve terminals (CPV10, CPV14, CPV18) and their corresponding valve types.
Details fitting variants for CPV valve terminals with individual tubing: onto a wall, hat rail, or a stand.
Provides details on mounting kits and procedures for fitting the CPV valve terminal onto a wall, including rear and top mounting.
Describes mounting CPV valve terminals onto a pneumatic multipin, available in two forms: without or with assembly step.
Details precautions for using clean and correctly lubricated compressed air to ensure valve terminal service life.
Covers pre-commissioning checks: switching off power, earthing, complete fitting/wiring, and air supply for cooling.
Outlines commissioning steps: preliminary pneumatic tubing test and complete system commissioning via PLC/PC.
Details the procedure for checking valve-cylinder operation using manual override, with notes on non-locking override actuation.
Provides a table for troubleshooting pneumatic system issues like air leaks or system non-response.
Details the procedure for fitting or removing CPV valve terminal components, with warnings about power supplies.
Explains the CPV valve terminal's compact structure and its benefits for automation tasks and cost reduction.
Details different electrical connection types: IC, CP direct, MP, and AS-Interface connections.
Details the sizes of CPV valve terminals (CPV10, CPV14, CPV18) and their corresponding valve types.
Details fitting variants for CPV valve terminals with individual tubing: onto a wall, hat rail, or a stand.
Provides details on mounting kits and procedures for fitting the CPV valve terminal onto a wall, including rear and top mounting.
Describes mounting CPV valve terminals onto a pneumatic multipin, available in two forms: without or with assembly step.
Details precautions for using clean and correctly lubricated compressed air to ensure valve terminal service life.
Covers pre-commissioning checks: switching off power, earthing, complete fitting/wiring, and air supply for cooling.
Outlines commissioning steps: preliminary pneumatic tubing test and complete system commissioning via PLC/PC.
Details the procedure for checking valve-cylinder operation using manual override, with notes on non-locking override actuation.
Provides a table for troubleshooting pneumatic system issues like air leaks or system non-response.
Details the procedure for fitting or removing CPV valve terminal components, with warnings about power supplies.
| Operating voltage | 24 V DC |
|---|---|
| Protection class | IP65 |
| Ambient temperature | 0 °C to +50 °C |
| Storage temperature | -20 °C to +70 °C |
| Housing material | Plastic |
| Weight | 0.3 ... 1.5 kg (depending on configuration) |