EasyManua.ls Logo

Fieldpiece Job Link SC480 User Manual

Fieldpiece Job Link SC480
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
11
Fieldpiece
Job Link® System
Power
Clamp Meter
OPERATOR'S
MANUAL
Model SC480
Question and Answer IconNeed help?

Do you have a question about the Fieldpiece Job Link SC480 and is the answer not in the manual?

Fieldpiece Job Link SC480 Specifications

General IconGeneral
BrandFieldpiece
ModelJob Link SC480
CategoryMeasuring Instruments
LanguageEnglish

Summary

Safety Information

Measurements Dial and Controls

Measurements Dial Overview

Explains the rotating selector switch for choosing measurement parameters.

Voltage and NCV Measurements

Volts AC (VAC) Measurement

Details how to measure AC voltage, ranges, and accuracy.

Volts DC (VDC) Measurement

Details how to measure DC voltage, ranges, and accuracy.

Non Contact Voltage (NCV) Detection

Explains how to detect AC voltage without physical contact.

Current, Frequency, and Inrush Measurements

Amps AC (AAC) Measurement

Details how to measure AC current via clamp and test leads.

Frequency (Hz) Measurement

Explains measuring frequency on variable drives using the clamp.

Inrush AAC Current Capture

Captures and measures the initial surge current of motors.

MicroAmps DC and Capacitance Testing

Resistance, Continuity, and Diode Test

Temperature Measurement and Calibration

Power Measurements (Watts, VAr, VA, PF)

Power Calculations (W, VAr, VA)

Explains and details measurements of Watts, VAr, and VA.

Power Factor (PF) Measurement

Details how to measure and interpret Power Factor.

Phase Rotation Testing

Performing Phase Rotation Test

Step-by-step guide to identify 3-phase power line order.

Job Link System and Wireless Operation

Meter Functions and Maintenance

Related product manuals