EasyManua.ls Logo

Fillmaster Systems 3400 - Page 4

Fillmaster Systems 3400
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
PartTwo:ConnectingDigitalFillmastertoWaterPuricationSystem
Use the following steps to connect the dispenser to the Water Purication System. The same steps
are listed in Section 5 of the Water Purication System installation instructions (page XX-XX).
Tools Needed:
Tube cutters
Drill
Parts Needed:
White ¼” tubing
ZeroBac lter
Shut-off valve
¼” elbow
Mounting clip
Screw
Connection Steps:
1. Take the end of the white ¼” tubing and cut two smaller pieces of tubing. The rst
should be about two inches long and the second should be ve or more inches long.
2. Attach a shut-off valve to the end of the white ¼” tubing coming from the “OUT”
port of the DI lter. Make sure the valve is in the off position (perpendicular to
tubing).
3. Attach the smaller piece of tubing between the other end of the shut-off valve and
the “IN” port of the ZeroBac lter.
4. Take the longer piece of cut tubing and attach the ¼” elbow to one end.
5. Attach the open end of the longer second piece of cut tubing to the open port of the
ZeroBac lter. Attach the end of the tubing with the ¼” elbow to the inlet of the
dispenser.
6. Use the drill to install a mounting clip on the wall to hold the ZeroBac lter in place
once you have determined where the lter will lie.
7. Continue to Part Three: Installing the Battery.

Other manuals for Fillmaster Systems 3400

Related product manuals