EasyManua.ls Logo

Filtec ft-70 User Manual

Default Icon
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
FT-70 and FT-75
Operation Guide
40274-0600

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Filtec ft-70 and is the answer not in the manual?

Filtec ft-70 Specifications

General IconGeneral
BrandFiltec
Modelft-70
CategoryMeasuring Instruments
LanguageEnglish

Summary

FT-70/75 System Overview

Inspection System Description

Provides operator's information about bottle and can versions of the FT-70 and FT-75 Inspection Systems.

Fill Level Inspection Basics

Explains the principle of creating a radiation fingerprint of the container for fill level inspection.

Optional System Features

Details additional inspection capabilities that can be added to the FT-70/75 unit.

Operating Your FT-70/75

Starting-Up Your FT-70/75

Outlines the simple and quick procedure to get the FT-70/75 ready for operation.

The Safety Interlock Switch

Explains the purpose and operation of the physical on/off switch for the X-ray Generator.

Container Changeover

Describes how to reconfigure the unit for a different container type to match production needs.

Adjusting the Inspection Head Height

Details how to align the Inspection Beam to the container's Target Fill Level via mechanical adjustments.

Using the System Software

The Operator Control Panel

Describes the interface used to interact with the FT-70/75, featuring keys and an LCD display.

Software Function Groups

Explains the six numbered function groups that organize the system's software capabilities.

Software Function Descriptions

Provides detailed explanations for each software function available to the operator.

Diagnostics and Troubleshooting

Diagnostic Errors

Introduces the section on identifying error codes and their descriptions to help diagnose problems.

Troubleshooting Procedures

Offers simple procedures to quickly correct common problems with the FT-70/75 unit.

Maintenance Procedures

Maintenance Schedules

Lists the recommended maintenance actions at different intervals (daily, weekly, monthly, 120-day).

Maintenance Procedures

Provides detailed steps for performing various maintenance tasks on the FT-70/75 system components.

Related product manuals