EasyManua.ls Logo

FirstStreet Quingo - Page 74

FirstStreet Quingo
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
74
To attach the SUV kit to the Docking Station:
A) Slide L3 into the L2 inner
rail, ensuring that it is fully
engaged.
B) Insert the locating pin
through the rail to lock into
position.
C) Repeat the above steps
for the right-hand side. (R3
into R2)