EasyManuals Logo

Flomec Q9 Quick Start Guide

Flomec Q9
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Q9 Computer Retrofit Kit
A1 & 03 Electronic Digital Meters
This Kit includes:
(1) Replacement Computer Assembly with (2) (AAA) Alkaline Batteries
(4) Screws (4-40 X 3/8" Machine Screws) For Metal Body Turbines
(4) Screws (4-20 X 3/8" Plastite Screws) For Plastic Body Turbines
(1) Seal
(1) Battery Pad
(1) Coil Assembly w/Glue Dot
Installation Instructions:
1. Your meter must be installed with the arrow pointed in the direction of flow.
Note: You can rotate t
he computer display 180 degrees before it is installed.
2. Check that the batteries are secure in the back of the computer.
3. Clean the bottom surface of the coil counter bore of your meter housing. This
surface will be used to secure the coil assembly with permanent adhesive. Then,
remove and discard the peel off liner from the bottom of the coil to expose the
glue dot permanent adhesive. (See Figure 1)
4. Adhere the coil / glue dot combo to the coil counter bore surface previously
c
leaned, visually centered (see Figure 2). NOTE: The glue dot is permanent
adhesive and the coil cannot be maneuvered once contact is made with the
counter bore surface. Press firmly on the top of the coil with finger or other
object to ensure it is fully adhered to the surface.
5. Place the battery pad into the computer mount cavity, connect the coil wire to the
computer (see Figure 3), and mount the computer. Fasten the computer to the
turbine through the four corner holes in the faceplate using t
he screws provided
(4-40 x 3/8” for metal body turbines or 4-20 x 3/8” for plastic body turbines). Make
sure the seal is fully seated in the computer housing groove before tightening the
screws.
6. Check meter accuracy before using. Make sure there is no air in the system by
starting the flow until it runs steadily. Then stop the flow using a valve or nozzle.
7. Hold down DISPLAY button for three seconds to reset the meter's Batch Total to
zero. When zeroes appear, release the button.
8. Meter an exact known volume into an accurate container. For best results, meter
with one continuous full stream.
9. Check the readout. If the amount metered is accurate, field calibration is not
necessary. If not, refer to the Field Calibration Section in your Owner's Manual.
920896-11 Rev.-

Other manuals for Flomec Q9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Flomec Q9 and is the answer not in the manual?

Flomec Q9 Specifications

General IconGeneral
BrandFlomec
ModelQ9
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals