EasyManua.ls Logo

Flowserve BPO - Operational Recommendations; Startup Procedure; Troubleshooting Hot Seals

Flowserve BPO
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Operational Recommendations
5.1 Do not start up the equipment dry. Vent air from the casing of the pump and the seal chamber
before startup. Circulate clean product or a clean fluid from an external source through the seal
chamber whenever the equipment is in operation, API Plan 11 or 32.
5.2 If the seal runs hot, check for proper seal setting, seal housing dimensions, and check the
bypass or flush line for obstructions. Do not allow the equipment to run for any extended
time if the seal gets hot or squeals.
For special problems encountered during installation, contact your nearest Flowserve Sales and
Service Representative or Authorized Distributor.
6

Related product manuals