Do you have a question about the Flowserve Durametallic P-50 and is the answer not in the manual?
Mount the cartridge assembly onto the shaft/sleeve with setting devices near the housing.
Fit and bolt the pump back plate (seal chamber) onto the bearing frame.
Seat the gland against the chamber face, orient flush tap, and tighten gland nuts evenly.
Secure the P-50 seal by tightening the set screws once the pump components are in place.
Implement a seal flush system for a clean, cool environment to maximize seal life.
Ensure the pump is flooded with product fluid and the seal flush system is operating before startup.
Monitor the seal during start-up for heat or squealing; stop immediately if issues arise.
| Brand | Flowserve |
|---|---|
| Model | Durametallic P-50 |
| Category | Racks & Stands |
| Language | English |