EasyManua.ls Logo

Fluke 8024B - 4.33. Peak Hold Test; 4.35. Continuity Test

Fluke 8024B
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8024B
Table
4-5.
Resistance/Conductance
Test
3827
|
eur
Pataca
eS
tone
Ha
20022
10022
2kQ
20
kQ
200
k&2
2000
k&2
20
MQ
200
nS
4-33.
Peak
Hold
Test
4-34.
Use
the
following
procedure
to
verify
proper
operation
of
the
peak
hold
function:
1.
Select
the
AC
V
function,
2V
range.
2.
Connect
the
equipment
as
shown
in
Figure
4-3.
3.
Program
the
DMM
Calibrator
for
a
UUT
input
of
1.9V
ac
rms
at
100
Hz.
4.
Push
the
PEAK
HOLD
switch
to
the
ON
position
and
verify
that
the
UUT
display
is
between
1.833
and
1.967,
£3%
of
rdg
+
10
digits).
5.
Program
the
DMM
Calibrator
for
an
output
of
0.1
mV
ac
rms
at
100
Hz.
6.
Verify
that
the
UUT
display
changes
less
than
10
digits
in
10
seconds.
7.
Push
the
PEAK
HOLD
switch
to
the
OFF
position.
4-35.
Continuity
Test
4-36.
Use
the
following
procedure
to
verify
proper
operation
of
the
continuity
function:
1.
Select
the
function
and
2
kf
range.
2.
Connect
the
test
leads
to
the
COMMON
and
V/Q/S
terminals.
3.
When
the
test
leads
are
open
circuited,
the
Aup
arrow
will
be
displayed.
4.
Short
the
test
leads
together
and
observe
that
the
up
arrow
disappears
and
the
Wdown
arrow
is
displayed.
4-11

Related product manuals