EasyManua.ls Logo

Fluke DSP-100 - Page 187

Fluke DSP-100
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index
(continued)
3
—K—
Keys
for moving around screens, 2-3
functions, 2-13
—L—
Language
selecting a language, 2-21
selecting, quick start, 2-4
LED functions, 2-15, 2-29
Length
test for coaxial cable, 3-22
test for twisted pair, 3-8
variations between cable pairs, 3-8
variations between measured and actual, 7-
14
Length units
selecting, 2-26
selecting, quick start, 2-4
Link. See Basic link
Link performance grade, 3-4
—M—
Maintenance, 8-1
Memory
capacity and type, 8-16
full, 3-25
maintained by lithium battery, 8-3
space available, 3-25
Monitor
hub port capabilities, 4-23
monitoring impulse noise, 4-20
changing the noise threshold, 4-20
connections, 4-21
screen items, 4-23
monitoring network activity, 4-16
connections, 4-17
screen items, 4-18
—N—
NEXT
explanation of NEXT, 7-9
minimizing NEXT, 7-13
NEXT@Remote test results, 3-14
plot description, 3-13
results screen items, 3-12
Noise
causes of electrical noise, 7-6
changing the impulse noise threshold, 4-20
monitoring impulse noise, 4-20
Noise test, 2-22
Numeric format
selecting, 2-26
selecting, quick start, 2-4
NVP
determining cable NVP, 6-3
explanation of NVP, 7-14
—O—
Open
wire map display, 3-7
Overvoltage test, 2-22
—P—
PC interface cable, 8-13
Power line filter frequency
selecting, 2-23
selecting, quick start, 2-4
Power sum NEXT test, 3-19
Power-down timer, 2-28
Power-off timer, 2-28
Printing
configuring the serial port, 5-2
connections for printing, 5-3
error, 5-5
options, 5-3
printer interface cable, 5-2
Problems
with the test tool, 8-5
Propagation delay test, 3-9
PSNEXT test, 3-19
—Q—
Quick configuration, 2-4
Quick start, 2-3

Table of Contents

Related product manuals