Chapter 17: Use Projects
Tutorial: Make a New Project
517
the tester’s PROJECT screen, these names show in this format:
Organization Name>>Project Name>>Subproject Name.
See “About Project Names from LinkWare Live” on page 518.
Operator: The name of the person who will do the tests for the
project. For each operator you can also enter the email address
that the operator will use as an ID to sign in to LinkWare Live.
The date range for the results in the project.
Results: A summary of the test results in the project:
: The number of tests that failed.
: The number of tests that passed.
: The number of results from tests on twisted pair cable that
have PASS* results. PASS* results have measurements within
the range of accuracy uncertainty for the tester. See “PASS*/
FAIL* Results” on page 98.
To see the results, tap the panel.
Test Setup: The tests that are necessary for each cable in the
project.
To add a test to the project, tap NEW TEST.
For information about twisted pair test settings, see Chapter 3.
For information about OTDR test settings, see Chapter 11.
Cable ID Sets: The sets of IDs the tester can use for the names of
test results. Each ID set is for either copper or fiber cable.
To add a set of IDs to the project, tap NEW ID SET. See “How to
Make ID Sets” on page 548.
To use a different project, tap CHANGE PROJECT, then tap a
project.
To make a new project, tap CHANGE PROJECT, then tap NEW
PROJECT.