EasyManua.ls Logo

FNS POWER FCIFP48100A - Battery Module Installation

FNS POWER FCIFP48100A
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Be sure to use insulated tools (torque wrench, extension, socket, etc.).
All the instruments must be insulated and no metal articles (e.g. watch,
ring) should be present in the installation area.
All power switches must be turned off in advance.
Prepare a CO
2
fire extinguisher, a first aid kit, and an AED (automated
external defibrillator) before installation.
Arc Flash and Shock Hazard
Insulated tools are required for any work on this energized equipment.
Sharp Edges
Wear gloves and other protective gear to prevent injury.
Pinch Point
Use caution when working in the enclosure to prevent injury.
Heavy Object
Can cause muscle strain or back injury.
Use lifting aids and proper lifting techniques when moving trays, batteries
and other heavy objects.
4.1 Battery Module Installation
1. Transport battery modules to the installation location.
3. Place the battery modules on the rack frame or cabinet.
4. Fix the battery on the rack. Using the cabinet bolt to fix the battery into the hole on the rack.
5. After installation, tighten all bolts.