A.Place 2 pcs pulleys onto & below the cable,Secure the pulleys with 2pcs M10 *50 Allen bolt (88#),4pcs
φ
10
washer (78#) and M10 Aircraft nut (87#).
B.Draw the cable around the pulley and upwards,Place 1 pc pulley below the cable and secure the pulley with the
same way in A.
C.Draw the cable around the pulley and backwards,Place the 3ND pulley below the cable and secure it with the
same way in A.
D.Draw the cable around the pulley and downwards,place 1 pc pulley onto the cable ,Secure the pulley with the
same way in A..
E.F Draw the cable around the pulley and upwards,place 2 pc pulley below the cable ,Secure the pulley with the
same way in A..
G. H Draw the cable around the pulley and downwards,Place 2 pcs pulley onto the cables , secure the pulley with
the same way in A .
I Draw the cable around the pulley and upwards,Thread the end of the cable to the bracket fixing
frame(43#) ,Secure it with 1pc M10 *45 Allen bolt (101#),2pcs φ10 washer (78#) and M10 Aircraft nut (87#).