Align the T-Rail sections on the floor.
Connect these rails together with the rail
couplers as shown
All rail pieces must be aligned properly
Ensure the square bolt necks are
seated into the square holes
Attached the Pulley
Bracket Assembly to the end
of the front rail with 2 M8*16
hex bolts and 2 M8 locknuts.
Align the Pulley Bracket & Rail
Sectional Steel T-Rail Assembly
STEP1:Connect the T-Rail Sections
STEP2:Attached the Pulley Bracket