Disposal Requirements
If not disposed of properly, these cabinets have components that can be harmful to the environment. All
cabinets must be disposed of by appropriately registered and licensed waste contractors, and in accordance
with naonal laws and regulaons.
Care should be taken to avoid prolonged contact with cold surfaces with unprotected body parts, Correct
PPE to be used at all me.
When moving the appliance appropriate gloves should be worn, and a relevant risk assessment carried out
English
Aer unpacking, clean and allow the cabinet to stand for 2 hours before turning on (cleaning direcons
supplied within this manual). Ensure the cabinet is situated away from both hot and cold air sources,
as this will aect its performance. Make sure that a minimum clearance of 150mm above the cabinet is
available for venlaon and eecve operaon. Connect the unit to a suitable mains power outlet and turn
the supply on. Do not plug or unplug the unit with wet hands.
Start-Up and Test Sequence
Cabinets & counters are supplied ready for operaon.
Aer connecng the unit to the mains the display will briey show a dash in the centre of the screen. This
will then show
Press and hold the buon for 3 seconds then release. (If pressed and held for 5 seconds then released
will start the ‘Test Sequence’).
To cancel the ‘Test Sequence’ press and release the buon during the test.
If not pressed the test will connue and when complete the controller will wait 1 minute, then resume
normal operaon.
User Adjustments
To Check Storage Temperature Set Point
Press the buon for at least half a second to display the set point. if set point is unable to be
changed, please refer to keypad security sengs.
Manual Defrost
To iniate a manual defrost press and hold the defrost buon for 2 seconds
2