Installation and commissioning
13
• Fill sealer with SEALIT sealing liquid.
• Check the filling level. The sealer should
be filled roughly up to the “max” mark.
• Close the filling opening with the cover.
• If necessary: Dry the sealer outside.
Step 4: Connecting the PostBase Vision
Caution! If the PostBase Vision was previ-
ously in a cold environment (i.e. below 10 °C /
50 °F): Wait at least 2 hours after unpacking
before connecting the franking machine. The
PostBase Vision needs this time to adjust to
the environmental conditions.
Caution! Do not connect the PostBase Vision
Feeder (the optional automatic feeder) until
Step 7. The PostBase Vision franking
machine must be fully installed to do this.
Otherwise the Feeder will not be recognised
by the franking machine. The mailing system
will not work.