EasyManua.ls Logo

Fronius IG 60 HV - Page 21

Fronius IG 60 HV
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
ENEN
Startup phase
(continued)
(4) Startup test
- Before the FRONIUS IG unit starts supplying power into the mains,
the conditions of the mains network are tested in detail in accor-
dance with the regulations of your country.
- the screen displays „START
UP
Depending on the regulations of each country, the startup test can take
between just a few seconds up to several minutes. The time elapsed is
indicated by a bar shrinking from top down.
(5) Synchronisation ENS (option)
- if the FRONIUS IG unit is equipped with the ENS option, every
detail of the ENS will be tested and synchronized
- the screen displays „SYNC
ENS
Depending on the operating status of the ENS, test and synchronization
may take up to several seconds.
(6) Operation of feeding power supply into the mains network
- After termination of the tests, the FRONIUS IG unit starts feeding
power into the mains network.
- The LED lights up green, and the FRONIUS IG unit starts operating
Whenever two scale divisions stop flashing and disap-
pear, 1/10 of the total duration of the test is over
(3) Synchronisation with mains
- The screen displays „SYN-
C
AC
- „WAIT
PS
“ is displayed: The
FRONIUS IG is waiting for all
power supplies in the network
to be on stand-by. This proce-
dure takes place dependent
on the DC-voltage.
- „SYNC
AC
“ is displayed subse-
quently.

Table of Contents

Related product manuals