EasyManua.ls Logo

Fronius Rapid Shutdown Box Duo - GEN24 Inverter: Connecting RSB to Emergency Stop Button; Connecting RSB to Fronius Primo 10.0-15.0

Fronius Rapid Shutdown Box Duo
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GEN24 inverter:
Connecting the
Rapid Shutdown
Box to an emer-
gency stop but-
ton
Emergency Switch Stop
Connecting to external emergency
stop:
If an external emergency stop is required,
it can be installed anywhere in the signal
line. When the connected emergency stop
button is pressed, the Rapid Shutdown is
started and the PV field is disconnected in
the Rapid Shutdown box. As soon as the
emergency stop button is returned to its
original position, the PV field is reconnec-
ted.
Requirements for external emergency
stop:
- Maximum switching load: 30 V DC / 5
mA
- Nominal voltage between contacts
and housing: 600 V DC
Connecting the
Rapid Shutdown
Box to a Fronius
Primo 10.0 / 11.4 /
12.5 / 15.0
ATTENTION! ?
Wiring schemes show best practice examples assuming that more than two PV
strings connected in parallel require overcurrent protection (e.
g. fusing). Refer to Primo installation manual regarding multi conductor wiring and fusing
details
If multiple strings are connected to an MPP tracker, the string voltages should be as
equal as possible in order to avoid power losses.
Connecting 4 Solar Module Strings to the Fronius Primo 10.0 / 11.4 / 12.5 / 15.0
RSB Quattro
20

Table of Contents