EasyManua.ls Logo

Fuji Xerox DocuCentre-IV C5575

Fuji Xerox DocuCentre-IV C5575
459 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checking Completed Jobs
405
Job Status
11
Checking Completed Jobs
This section describes how to check completed jobs.
You can check whether a job has been completed successfully. Selecting a job allows you to
see its details.
1 Press the <Job Status> button.
2 Select the [Completed Jobs] tab.
Note Select [ ] to return to the previous screen or
[ ] to move to the next screen.
From the drop-down menu, you can select
and display the desired type of jobs.
Deselect the [Group Parent Jobs] check box to
display child jobs of the completed Broadcast
Sends. Select a child job from the list to show
its details.
When the [Group Parent Jobs] check box is selected, select a parent job to show its child jobs, and
select a child job from the list to show its details.
In the [Result] column, the number of copies will be shown for a Copy job, the number of pages for a
Print job, and the scaling factor (%) for a Scan job. To confirm what value is shown, select the job
and switch to the Job Status screen.
3 Select a job to see the details.
4 Select [Close] after the confirmation.
Group Parent Jobs
Allows you to check the list or history of related jobs (such as job flow jobs).
Show Child Jobs
Displays a job list.
Print this Job History Report
Prints the Job History Report.
Print this Job Report
Prints the Job Report.
<Job Status> button

Table of Contents

Other manuals for Fuji Xerox DocuCentre-IV C5575

Related product manuals