EasyManua.ls Logo

Fujitsu ASU9CQ - Page 64

Fujitsu ASU9CQ
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE & LUBRICATION SCHEDULES
TAB 1.4
EQUIPMENT:
WATER
HEATER
DWH-12
MAKE: BRADFORD
WHITE
MODEL:
D-7
5T-300-3N
REFERENCE: o &M MANUAL SECTION: TAB - 3.3
MAINTENANCE
Have a qualified technician:
MONTHLY
• Drain a gallon
of
water to remove silt and sediment.
QUARTERLY
• Inspect the cleanout tank. Clean as necessary.
SEMI-ANNUALLY
• Visually check the pilot and burner flames.
ANNUALLY
• Check the ignition systems, temperature controls and any other water heater controls.
• Check all safety shut-off valves to verify proper operation and tightness
• Inspect venting system. Clean or repair as necessary.
• Remove the main burner rack to clean orifices and related parts.
• Inspect burner ports. Clean as necessary.
• Check the combination temperature and pressure relief valve. Clean as necessary.
• Inspect the anode rod. Replace when necessary.
UNIT SENIORS HOUSING PENTICTON KIWANIS HOUSING SOCIETY
BC TECH ENGINEERING SERVICES INC.
PAGES

Table of Contents