3. BASIC OPERATION
3. SETTING
3-1. FLOW OF INSTALLATION
The following is the flow of the installation of a central remote controller.
• INSTALLATION
INSTRUCTION SHEET
DIP-SW setting • • • • Refer to “INSTALLATION
INSTRUCTION SHEET”.
Installation / Wiring • • • • Refer to“INSTALLATION
INSTRUCTION SHEET”.
Turn on power • • • • Refer to “3-2-1 Turn on
power”.
Initial setting • • • • Refer to “3-2-2 Initial
setting”.
Clock setting • • • • Refer to “3-2-3 Clock
setting”.
Group information store • • • • Refer to “3-2-4 Group
information store”.
Test operation • • • • Refer to “3-2-5 Test
operation”.
• SETTING MANUAL
Se_Ch3_p11-29.p65 01.5.22, 4:04 PM11