Do you have a question about the FULTON FT-1000C and is the answer not in the manual?
Actionable advice for gas leak incidents.
Detailed instructions and requirements for gas supply installation.
Guidelines for connecting the system, drain/fill, and heater.
Information on thermal fluids, selection, and breakdown.
Checklist for pre-operation review and system readiness.
Procedures for filling the system with thermal fluid.
Step-by-step guide for first-time unit start-up or post-shutdown.
Recommended flow rates and pressure drops for different models.
Essential maintenance tasks after initial operation to meet warranty.
Procedures for testing critical safety devices.
Guide to diagnosing and resolving common operational issues.
Technical specifications including heat output, pressures, and connection sizes.