Do you have a question about the FULTON FT-0160C and is the answer not in the manual?
Adherence to codes for gas supply installation, including piping, regulators, and pressure requirements.
Specifications and installation guidelines for fuel oil supply, including viscosity and sulfur content.
Procedures for pneumatic testing, leak detection, and system boilout.
Information and precautions regarding thermal fluids used in the system.
Checklist for pre-start-up activities, including local approvals and installation review.
Procedures for filling the system with thermal fluid, ensuring no air pockets.
Instructions for reading pump manuals and ensuring proper pump operation.
Instructions for starting the unit for the first time or after a prolonged shutdown.
Essential maintenance tasks to be performed after the initial shutdown for warranty compliance.
Recommended schedule for operator tests and checks to ensure safe operation.
Procedures for checking safety devices such as temperature limits and switches.
Troubleshooting common issues related to the heater system.