7
English
Important Informaon
This energizer complies with internaonal safety regulaons and is manufactured to internaonal standards.
Gallagher reserves the right to make changes without noce to any product specicaon to improve reliability,
funcon or design. E & OE.
The author thanks the Internaonal Electrotechnical Commission (IEC) for permission to reproduce Informaon
from its Internaonal Publicaon 60335-2-76 Ed.2.2 (2013) - BB1. All such extracts are copyright of IEC, Geneva,
Switzerland. All rights reserved. Further informaon on the IEC is available from www.iec.ch. IEC has no responsibility
for the placement and context in which the extracts and contents are reproduced by the author, nor is IEC in any way
responsible for the other content or accuracy therein.
SERVICE OF DOUBLE-INSULATED APPLIANCES
In a double-insulated controller, two systems of insulaon are provided instead of grounding. No equipment
grounding means is provided in the supply cord of a double-insulated controller, nor should a means for
equipment grounding be added to the controller. Servicing a double-insulated controller requires extreme
care and knowledge of the system, and should be done only by qualied service personnel. Replacement parts
of a double insulated controller must be idencal to the parts they replace. A double insulated controller is
marked with the words “DOUBLE INSULATION” or “DOUBLE INSULATED”. The symbol for double insulaon
may also be marked on the appliance.