EasyManua.ls Logo

Garage Smart MY LIFTER BASIC LIFTER - Installation Part 1: Mounting Bracket; Step 3: Marking and Drilling Pilot Holes; Pilot Hole Installation Warning

Garage Smart MY LIFTER BASIC LIFTER
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION PART 1: MOUNTING BRACKET
Step 3: Install The Mounting Bracket, cont.
Place the mounting bracket on the joist. Be sure
to align the mounting holes with the center of
the joist. With a pencil, mark an “X” on the
ceiling where you want the two holes to mount
your Lifter (Figure 1.3).
With a drill and the supplied drill bit, align the
bit on your marks and drill at least a 3" deep
pilot hole into the joist (Figure 1.4). The pilot
hole should drill through the sheetrock and into
the wood ceiling joist.
Fig 1.3
Fig 1.4
14

Related product manuals