Page #18 background imageLoading...
Page #18 background image
Installation Instructions
WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION
Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions
provided with the plenmn.
IMPORTANT: The wall plenum is not designed to carry structural loads.
Proper wall header construction is required. The plenum requires proper
flashing, shim and caulk for a weather resistant installation.
Proper header for
structural support.
Apply proper caulking
and flashing.
Properly square and
lexel plenmn.
Architectural
Louver--RAVAL1
Exterior/0utside Wall
Wall Plenum
RAVWP6- 6"D x 19¾"VVx 32"14
RAVWP8- 8"D x 19¾"VVx 32"14
RAVWP12- 12"D x 19¾"VVx 32"14 Case
RAVWP15- 15"D x 19¾"Wx 32"14
[] BUILD AND INSTALL THE
ZONELINE BASE PLATFORM
1. Construct a 23V(' rain. x 23¼" rain. square pladimu.
NOTE: The platform must have a load-bearing
capacity of 175 lbs. minimum.
-..J
\S
8" rain: /
:;:de::m M'J __/'_Qlt0ut;pr drail,
COllll_CtlO[1
2. Place the platfimn in the utiliW closet with the
following clearance between it and the interior
surface of the walls/door/panel:
4" rain. ti'om front of the case - Unit to be
installed through FRONT of case
5" rain. fl'om front of the case - Unit to be
installed through SIDE of case
3" rain. fl'om two sides of the case
3. Align the platflmu with the oI)eniw,_ of
the wall plenum and secm'e to the floor
using appropriate brackets and bolts.
18

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AZ75H12EACM1 and is the answer not in the manual?

GE AZ75H12EACM1 Specifications

General IconGeneral
BrandGE
ModelAZ75H12EACM1
CategoryAir Conditioner
LanguageEnglish

Related product manuals