EasyManua.ls Logo

GE b30 - Page 528

GE b30
532 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-2 UR FAMILY – COMMUNICATIONS GUIDE
REVISION HISTORY APPENDIX A: MISCELLANEOUS
A
Table A-4: Major changes for version AE3 (English)
Table A-5: Major changes for version AE1 (English)
Table A-6: Major changes for version AC1 (English)
--- Update Phase Time Overcurrent number from 4 to 6 for C60, 3 to 6 for C70, 4 to 6 for F60, 2 to 4 for L30 and L60, and 4 to 6 for
L90 and M60 in features per product table, Modbus memory map
--- Updated (Disconnect) Breaker Switch number for 16 to 24 for C60 in features per product table, Modbus memory map
1-4 Updated features per product table, specifically updated Contact Inputs from 96 to 120 and Contact Outputs from 64 to 72,
as well as Breaker Restrike numbers
2- Updated Modbus memory map and F codes, including addition of PEAP-GTC and PAP protocols for user logins when using a
RADIUS server
2-9 Added information on the four time code fields added under the IEEE 2013 COMTRADE standard, in the Reading Oscillography
Files section
3- Updated IEC 61850 Communications chapter, including several IMD tables
Page Change
--- Deleted Pilot POTT for D60, L90 from Features per Product table, Modbus memory map
2-9 Added information on the four time code fields added under the IEEE 2013 COMTRADE standard, in the Reading Oscillography
Files section
3- Updated IEC 61850 Communications chapter, including several IMD tables
Page Change
2- Updated Modbus memory map
3- Updated IEC 61850 Communications chapter
Page Change
--- Rebranded from GE Digital Energy to GE Grid Solutions
1- Updated Features per Product table
2- Updated Modbus memory map and F codes
3- Updated IEC 61850 Communications chapter
Page Change

Table of Contents

Other manuals for GE b30

Related product manuals