EasyManua.ls Logo

GE CT ProSpeed Series

GE CT ProSpeed Series
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS CT PROSPEED SERIES INSTALLATION
2124011
3-21
REV 15
3–3–2 OC CRT (continued)
4. Connect the power cable to the CRT power socket as shown in Illustration 3–16.
CRT POWER CABLE
SOCKET
CRT POWER CABLE CONNECTION IN OC
ILLUSTRA
TION 3–16
5. Connect the signal cable to CN13 on the MVAMP II board at the front of the OC (Slot #1).
6. Return the fan panel to its original position and screw it into place using the screws removed in step 2.

Related product manuals