EasyManua.ls Logo

GE G500 - Page 2

GE G500
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G500 Substation Gateway,
Quick Start Guide
GE Grid Solutions
2
SWM0106-1.00-0 GE Information
The rack mounting kit includes 4 metal pieces (left bracket, right bracket, top filler plate and the bottom filler plate) along with M4
(quantity 10) and M3 (quantity 8) screws. The M4 screws are used to attach the left and right bracket to the G500 chassis and the
M3 screws are used to secure the top and bottom filler plates to the brackets.

Related product manuals