EasyManua.ls Logo

GE GE-200A User Manual

GE GE-200A
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Model
GE-200A
Main Breaker
200 amp Horizontal throw left (off) to right (on)
Generator Breaker
Top right side 2 positions
WARNING
Only qualified personnel should be working on the panel box
An amateur should NEVER open the panel box
Please follow all rules and regulations of the National Electric Code
Step 1: Disassemble the interlock. Place the bottom plate (holes only) above the top right breaker and mark
holes. Plate is parallel to top right breaker.
Step 2: Turn off main breaker and remove panel cover.
Step 3: Drill holes as marked on panel cover with supplied 3/16 drill bit and remove all burs from drilling cover.
Step 4: Insert screws from rear of cover, install bottom plate, and install top plate (slotted) install thread lock to
screws and install retaining nuts. Ensure proper movement.
Step 5: Install 2 pole Generator breaker on top right side and place Generator Warning Sticker on Generator
breaker.
Question and Answer IconNeed help?

Do you have a question about the GE GE-200A and is the answer not in the manual?

GE GE-200A Specifications

General IconGeneral
BrandGE
ModelGE-200A
CategoryCircuit breakers
LanguageEnglish

Summary

General Safety and Panel Preparation

Panel Box Safety Warning

Emphasizes qualified personnel and adherence to the National Electric Code for panel work.

Prepare Panel for Installation

Turn off main breaker and remove the electrical panel cover.

Interlock Installation Procedure

Mark and Drill Panel Cover

Mark holes for the interlock plate, drill them, and remove any burrs from the cover.

Assemble Interlock Mechanism

Install bottom and top plates using screws, thread lock, and retaining nuts for proper movement.

Install Generator Breaker and Sticker

Mount the 2-pole Generator breaker and apply the Generator Warning Sticker.

Secure Breakers with Zip Ties

Create a loop with zip ties and secure them around the top set of breakers for stability.

Final Verification and Operation

Reinstall Cover and Test Interlock

Reinstall the panel cover and verify correct interlock operation for both breakers.

Apply Operational Labels

Place Generator start-up and CAUTION labels on the panel box and meter pan.

Disclaimer and Contact Information

Product Use Disclaimer

States GenInterlock.com is not responsible for misuse or improper installation.

Related product manuals