EasyManua.ls Logo

GE GXRV10ABL01 - Post-Installation Procedures; Final Sanitization and Purging; Installation Completion Checklist

GE GXRV10ABL01
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Now That Your Reverse Osmosis System is Installed…Sanitize
Customer ServiceTroubleshooting Tips
Operating Instructions
Safety Instructions
Installation Instructions
Sanitize upon installation and after servicing inner parts, including replacement of
prefilter, postfilter and the Reverse Osmosis cartridge. It is important to wash hands with
anti-bacterial soap before handling inner parts of the system. See the
Sanitizing the Reverse
Osmosis System
and
Purging the Reverse Osmosis System
sections.
CAUTION:
If installing unit in New Construction, ensure house plumbing is flushed
thoroughly before opening the water supply valve. Also, before sanitizing, be sure to
remove all cartridges as described in the
Sanitizing the Reverse Osmosis System
section
.
Chlorine will destroy the Reverse Osmosis cartridge.
17
Installation Checklist
1. Are all tubing connections tightened? Do they run between the points shown? No leaks!
2.
Did you use drain option B, C or D? Make sure the 3⁄8²drain tubing, from the faucet to
the drain point, is without loops, dips, or low-spots.
3. Is the water supply shutoff valve open?
4. Did you sanitize and purge the system?

Related product manuals