Introduces the manual's purpose and scope for site preparation and planning.
Outlines the roles and responsibilities of the customer during system installation.
Details the steps and workflow for preparing the site before system installation.
Provides an overview of the Innova system components, including positioners and tables.
Identifies and illustrates the main components of the Innova system.
Details compatibility information for the Innova LC Positioner with other system components.
Lists compatibility cross-references for different table sub-systems.
Outlines compatibility cross-references for the Jedi X-Ray Generator.
Specifies compatibility cross-references for the X-Ray Head.
Details compatibility for Innova LC imaging and X-Ray control systems.
Provides compatibility cross-references for monitor support and suspension systems.
Lists compatibility cross-references for various monitor sizes.
Describes the three main room types required for system installation.
Details environmental conditions including temperature and humidity requirements.
Details compliance with electromagnetic standards, including emission and immunity.
Addresses precautions and responsibilities regarding radiation protection during installation.
Specifies the audible noise levels for various system components.
Outlines requirements for windows and curtains in the examination room.
Covers structural requirements including room size, door size, floor, walls, and ceiling.
Discusses key factors for planning the room layout, including access and constraints.
Provides diagrams illustrating various room layout configurations for the system.
Presents dimensional drawings for various Innova system components.
Details floor loading and recommended mounting methods for system components.
Provides guidance on floor mounting for positioners and tables for correct placement.
Lists floor preparation kits for Innova LC Positioner and Omega/InnovaIQ Tables.
Details the requirements and considerations for mounting injectors on the system.
Explains the power distribution system and AC interconnect configurations.
Covers recommended power distribution system, functions, and configurations.
Details system grounding requirements for patient safety and equipotentiality.
Specifies requirements for ground and power supply cables provided by the customer.
Details wiring diagrams, floor conduits, and requirements for the IVUS Rev 1 option.
Covers wiring diagrams, floor conduits, and requirements for the IVUS Rev 2 option.
Describes the distribution of X-Ray on-line indicators and room lighting.
Explains room lighting control via a relay connected to the C2 cabinet and PDB.
Details the installation and placement of a remote speaker in the exam room.
Discusses door interlocks requirement according to IEC 60601-2-43 and local regulations.
Covers partial and full UPS options for system operation during power failures.
Details installation and power connection for remote, pedestal, and L.F. ILLUMINA injectors.
Discusses power connection and grounding verification for Advantage Windows.
Refers to a specific document for MAC-LAB System EX preinstallation.
Provides guidelines for system interconnect cabling, distribution, and routing.
Covers general principles for separating cables and using conduits/ducts.
Provides synoptic views and details of physical cable runs and their lengths.
Details personnel requirements, tools, safety, and procedures for cable routing.
Describes grounding requirements and procedures for system facility power.
Details procedures for connecting US Fluoro UPS and PDB.
Provides shipping dimensions and methods for various system components.
Lists the tools and test equipment required for installing system components.
Details steps for planning and verifying the equipment delivery route.
Explains component selection for European installations.
Provides a checklist for ensuring site readiness for GEHC equipment installation.
Lists configuration checks required prior to an Innova IQ Table upgrade.
Provides contact information and procedures for obtaining an IP address.
Introduces seismic requirements and their determination by authorities.
Lists seismic calculations for various system cabinets and components.