EasyManua.ls Logo

GE Innova 2000 User Manual

GE Innova 2000
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Technical
Publications
2337741–100
Revision 5
Innova 2000 Cardiovascular Imaging
System
Pre–Installation Manual
pim
do not duplicate
Copyright
2002, 2003, 2004 and 2005 by General Electric Co.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the GE Innova 2000 and is the answer not in the manual?

GE Innova 2000 Specifications

General IconGeneral
X-ray GeneratorHigh-frequency generator
Image AcquisitionDigital
Detector TypeDigital flat panel detector
Frame RateUp to 30 frames per second
WeightApproximately 1200 kg

Summary

Chapter 1: Introduction to Innova 2000 System

Description of Innova 2000 System Components

Overview of Innova 2000 system parts: positioner, patient table, X-ray generator, etc.

Pre-Installation Process Overview

Details site preparation steps and information flow required before system installation.

Chapter 2: System Compatibility

Innova LC System Compatibility Details

Cross-reference tables for Innova LC positioner and Omega tables sub-system compatibility.

Chapter 3: Physical Room Requirements

Environmental Requirements and Limitations

Specifies room climate, humidity, and temperature requirements for system components.

Structural Installation Requirements

Covers room size, door dimensions, and floor specifications for equipment installation.

Electrical Requirements and Grounding

Details system line voltage, phases, current, frequency, and essential grounding specifications.

Chapter 4: Physical Characteristics

Dimension Drawings for System Components

Provides detailed dimensional drawings for system components and their relative positions.

Mounting Requirements and Methods

Specifies floor loading, weights, and recommended mounting methods for system components.

Chapter 5: Room Layouts

Room Layout Considerations

Discusses radiation protection, service access, and clinical access requirements for room setup.

Emergency Procedures and Protocols

Addresses system failures and main power supply interruptions, including recovery steps.

Chapter 7: Additional Planning Aids

Tools and Test Equipment for Installation

Lists all required tools and test equipment for system installation and calibration.

Route Survey Procedure

Guides the process of surveying the delivery route for equipment transport and site access.

Pre-Installation Checklist and Site Readiness

Verifies site readiness and customer information using a comprehensive checklist.

Chapter 8: IP Addressing Process

Contacting GEM for IP Address Acquisition

Provides contact information for obtaining IP addresses from GEM service centers globally.