Do you have a question about the GE Innova 3100 and is the answer not in the manual?
Frame Rate | Up to 30 fps |
---|---|
Generator Power | 100 kW |
Detector Type | Flat Panel Detector |
Detector Size | 31 cm x 31 cm |
Voltage Range | 40 to 125 kV |
Current Range | 10 - 1000 mA |
Image Processing | Advanced Image Processing Software |
System Weight | Approximately 2500 kg |
Power Requirements | 50/60 Hz |
Application | Cardiovascular, Angiography, Interventional Radiology |
Display Monitors | Dual high-resolution monitors |
Outlines the duties of the purchaser/customer during installation.
Details the steps and checklists for preparing the site before installation.
Specifies environmental conditions and limitations for system operation.
Details the required room climate, including humidity and temperature.
Provides tables detailing the heat output of system components.
Covers compliance with EMC standards and related documentation.
Covers requirements related to the floor installation.
Details the electrical requirements for the Innova System, including power lines and PDB specifications.
Provides general considerations for planning room layouts.
Details clinical access requirements, including patient table clearance and CPR space.
Presents various recommended room layout configurations.
Shows example room layouts with suspension rails parallel to the table.
Presents an example room layout (example 3) with suspension perpendicular to the table.
Presents an example room layout (example 4) with suspension perpendicular to the table.
Shows a room layout example with a mobile system.
Directs users to dimensional drawings for system components.
Provides information on floor loading and recommended mounting methods for components.
Provides information on floor loading and recommended mounting methods for components.
Discusses critical distances and floor mounting templates for positioner and tables.
Details floor preparation kits for Innova LC and Omega/InnovaIQ Tables.
Details requirements for mounting injectors onto the table accessory rails.
Provides diagrams for AC interconnect configurations without and with Fluoro UPS.
Outlines the recommended power distribution system and its main functions.
Details requirements for ground cables that the customer must provide.
Specifies requirements for power supply cables that the customer must provide.
Explains how to interpret cable group schematics and cable length data.
Provides detailed specifications for system core cables, including part numbers and connectors.
Details the procedure for connecting the Fluoro UPS option cables.
Lists the necessary tools and test equipment for system components.
Outlines the process for surveying the intended delivery route.
A checklist used by GEHC to assess site readiness for installation.
Explains that seismic requirements are determined by the architect and may need agency approval.
Lists the various components for which seismic calculations are included.
Provides seismic anchorage calculations for the C1 Cabinet on slab or upper floor.
Provides seismic anchorage calculations for the C2 Cabinet on slab or upper floor.
Provides seismic anchorage calculations for the LC Positioner on slab.
Provides seismic anchorage calculations for the LC Positioner on an upper floor.
Provides seismic anchorage calculations for the Omega IV Table on slab.
Provides seismic anchorage calculations for the Omega IV Table on an upper floor.
Provides seismic anchorage calculations for the Omega V Long Table with baseplate on slab.
Provides seismic anchorage calculations for the Omega V Long Table with baseplate on an upper floor.
Provides seismic anchorage calculations for the Omega V Table on slab.
Provides seismic anchorage calculations for the Omega V Table on an upper floor.
Provides seismic anchorage calculations for the InnovaIQ Table with baseplate on slab.