18.3.3 Required Conditions
Condition Reference Effectivity
Gullets, raceways in place. - -
Different subsystems shall be color coded
to check the cable distribution in real time:
Yellow for C2 cabinet, Orange for C1
cabinet., Blue for Gantry and Brown for
Table.
- -
18.4 Procedure
18.4.1 Unpack the spools
1.
Extract the axis (
, Illustration 6-27) from the spools.
2.
Put in an other area the group 3 (
, Illustration 6-27) box.
3.
Slide down by hands (avoid lifting the full load) the upper spool.
4. Slide down by hands (avoid lifting the full load) the lower spool.
5. Remove the water cables from the spool and pack in plastic bag.
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
Chapter 6 Electrical Connections 215