EasyManua.ls Logo

GE JKP15 - Page 4

GE JKP15
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pre- Installation Checklist cont.
Place the oven on a table or platform
even with the cutout opening.
(Platform must support 150 lbs.
single, 275 lbs. double.)
4
Remove the bottom trim from the
top of the oven. It will be installed at
the end of installation. The trim is
wrapped separately and taped to the
top of the unit.
Installation Instructions
Conduit
Bottom
Trim
Side
Trim

Other manuals for GE JKP15

Related product manuals